Notice of Tender for the First Phase Project of Wuxi Subway Line 4 Project

Wuxi Metro Line 4 Project Phase I (Project Name/Project Name) Wuxi Metro Line 4 Municipal Pre-Municipal Line Relocation, Road Traffic Dispersal Project 04 Lot Lot Tender Construction Tender
Prequalification announcement (on behalf of the tender notice)
1. Tender conditions
The project for the first phase of the Wuxi Metro Line 4 project (name of the project) has been approved by the National Development and Reform Commission (name of the project approval, approval, or filing agency) with the tin modification basis [2013] (approval name and number), and the project owner For Wuxi Metro Group Co., Ltd., the construction fund comes from finance (fund source). The proportion of project investment is state-owned funds: 100.00%, private funds: 0.00%, foreign governments and organization investments: 0.00%, foreign private investment: 0.00%, and the tenderer is Wuxi Metro Group Co., Ltd. The bidding agency is /. The project has already met the conditions for bidding and is now conducting an open tender. Special potential interested bidders (hereinafter referred to as applicants) are invited to apply for prequalification.
2. Project Overview and Bidding Scope
2.1 Construction Site: Wuxi
2.2 Project Scale: Relocation of the pipelines and road traffic dismantling works in the early municipal period of Wuxi Metro Line 4
2.3 Planning Period: Calendar Day
2.4 Estimated Contract Price: 400.00 million yuan
2.5 Bidding scope: Line 1 relocation, road traffic relocation, etc. of the first phase of Wuxi Metro Line 4 station (including intermediate ventilation shafts) and interval, 2 in/out lines, and transformation of regional transportation nodes required for subway construction
2.6 Bid Division: 4 Bid Sections
2.7 Quality Standard: Qualified
2.8 Others: No bad faith record, no people’s court has been included in the list of untrustworthy enforcers in the past
(Indicating the construction site, scale, planned construction period, estimated contract price, scope of tender, division of tenders, etc.) of this tendering project.
3. Applicant qualification requirements
3.1 The prequalification requires that the applicant has the following qualifications: [Municipal Public Works (2015 New Standard) Level 2] (inclusive) or above, with the following achievements: From January 1, 2010 up to now, completed at least 20 million and above municipal public works construction There are two projects (similar project descriptions) and corresponding construction capabilities in terms of personnel, equipment, funds, etc. Among them, the applicant's proposed project manager must have the following conditions:
3.1.1 [Urban Public Works Registered Architect Level 1]
3.1.2 If the applicant intends to assign a project manager who possesses xx professional xx and above registered building architect qualifications or qualification of a small project manager, he must have an effective safety production evaluation certificate and register with the company for 3 months; If the applicant intends to assign the project manager with other qualifications, it must provide the labor contract signed with the applicant, proof of endowment insurance (the “Employees Pension Insurance Handbook” within the three-month payment list nearby or the three issued by the social security agency. Proof of monthly payment: In the past three months, the payment is made for three consecutive months and the payment time is in the first three months of the month when the tender announcement is issued. For example, if a project announces a tender announcement in May 2011, the project manager is required to submit Provide proof of endowment insurance payment from February to April 2011).
3.1.3 The proposed project manager must have one of the following conditions:
3.1.3.1 The proposed project manager has no construction in progress after the change.
3.1.3.2 The proposed project manager has no construction in progress after the change, and: the original contract period has expired and the date of change of filing has reached 6 months; or, the project has been suspended for more than 120 days due to non-contractor reasons, and The construction unit agreed and has gone through the project manager's change of formalities.
3.1.3.3 The proposed project manager has a construction in progress, but the project under construction belongs to the same project project, approval of the same project, sub-contracted or phased construction of the same construction site.
3.2 This prequalification does not accept (accept or not accept) a prequalification application for consortium. If the consortium applies for prequalification, it shall meet the following requirements:
3.3 Each applicant may submit a prequalification application for 4 (specific amounts) of the bids in the above bid of the project, but a maximum of 1 (specific amount) bids (applicable to the tendering project of the bid-sharing segment) are allowed.
4. Prequalification methods
This pre-qualification uses a limited quantity system (qualified system/limited quantity system).
With the adoption of the qualification system, all applicants who meet the criteria for review set forth in paragraphs 2.1 and 2.2 of the qualification review procedures in the prequalification documents for this project shall be prequalified.
With the limited number system, when there are more than 9 applicants who have passed the qualification examination, the tenderer selects nine prequalified applicants to participate in the bid in descending order of the following evaluation scores.
Evaluation method: See attachment.
5. Acquisition of prequalification documents