Jiangxi residents use hydropower to promote ladder prices

The just-concluded Durban Climate Conference “Save the Earth at the Last Minute” reminds us that humanity is facing increasingly severe environmental problems. During the “12th Five-Year Plan” period, Jiangxi Province will deepen the price reform of resource products and implement the ladder prices for electricity and water for residents. Yesterday, the reporter was informed that Jiangxi Province issued the “Comprehensive Work Plan for Energy Conservation and Emission Reduction of the 12th Five-Year Plan” in Jiangxi Province. By 2015, the energy consumption of the GDP of the entire province in the province dropped to 0.71 tons of standard coal (according to 2005. The price calculation) was 16% lower than that in 2010 and 33% lower than in 2005. During the 12th Five-Year Plan period, 13 million tons of standard coal was saved. During the "Twelfth Five-Year Plan" period, it is necessary to explore ways to regulate and control the total amount of motor vehicles in the city.

Failure to Complete the Phase-out Tasks Strictly Controlled Investment Projects Jiangxi Province has formulated the “Twelfth Five-Year Plan” for key industries to eliminate backward production capacity implementation plans and implemented the task decomposition to various regions and years. Improve the backward production capacity withdrawal mechanism, guide and supervise the elimination of backward production capacity enterprises to do a good job of staff placement. We will improve the elimination of production capacity announcement system, strictly control financially supported investment projects in places where deadlines are not fulfilled, and suspend the approval, approval, and filing of construction projects for key local industries; and revoke enterprises that have not completed deadline elimination tasks in accordance with the law. Emission permits, production licenses, and safety production licenses.

The rapid growth of energy consumption will be adjusted according to national arrangements for early-warning and control. Jiangxi Province establishes a mechanism for the decomposition and implementation of total energy consumption control targets in line with the province's actual implementation, and implements the total-level control targets to be implemented at all levels of the people's government and relevant departments to implement target responsibility management. , increase assessment and supervision. Establish a forecasting and early warning mechanism for total energy consumption, and provide early warning and control of places where total energy consumption has grown too fast.

Incomplete annual energy-saving enterprise mandatory energy audit Jiangxi Province implements an energy audit system, establishes and improves the enterprise energy management system, implements the energy utilization status reporting system, and promotes the implementation of energy-saving transformation. The implementation of key energy-consuming enterprise cadre hanging points to contact the energy-saving work system, arrangements for provincial direct and sub-district level city and above leading cadres to contact one company. We will assess the completion of energy-saving targets for key energy-using industrial enterprises, and impose mandatory energy audits on companies that have not completed annual energy-saving tasks, and rectify them within a time limit.

Eliminated the registration of "Yellow Label Car" before 2005

Jiangxi Province will also rationally allocate various transport resources in cities, give priority to the development of urban public transport, and promote the construction of urban rail transit in an orderly manner. Increase the proportion of railway electrification. Deeply carry out special campaigns on low-carbon transportation and transport for 1,000 companies in “caravans and ports” to promote energy conservation and emissions reduction in aviation and ocean shipping. Accelerate the elimination of old cars, locomotives, and ships, and basically eliminate the "yellow-marked cars" that were registered before 2005. Accelerate the improvement of vehicle fuel quality and implement the fourth phase of motor vehicle emission standards. Full implementation of motor vehicle environmental protection sign management.

In the “Twelfth Five-Year Plan” period during the “12th Five-Year Plan” period, the province will deepen the price reform of resource products and rationalize the relationship between resource prices for coal, electricity, oil, gas, water, and mineral resources. Promote the use of electricity and water ladder prices for residents. Improve power peak-to-valley time-sharing electricity price implementation methods. The punitive electricity price shall be applied to enterprises and products whose energy consumption exceeds national and local standards for energy consumption (power consumption) per unit product. Within the scope permitted by the national policy, the implementation of the differential electricity price and the punitive electricity price will be expanded as needed. Further improve the sewage treatment fee policy and study the sludge treatment costs gradually incorporated into the sewage treatment costs. Reform waste disposal fees and reduce collection costs.

Selection of prevention and control tasks Heavy taxation and taxation on environmental taxes Jiangxi Province has fully implemented the reform of resource taxes and charges. The measures for calculating the resource tax for crude oil, natural gas and coal have been changed from specific collection to ad valorem collection and the level of taxation has been appropriately raised. Unfair toll fund projects. Actively promote the reform of environmental taxes and fees, select prevention and treatment of heavy duty, technical standards, the maturity of the taxation of the introduction of environmental protection tax, and gradually expand the scope of collection.

Corporate Environmental Illegal Information and Credit Rating Linkage Jiangxi Province has proposed to increase credit support for energy-saving emission reduction projects by various financial institutions and encourage financial institutions to innovate credit management models that are suitable for the characteristics of energy-saving emission reduction projects. Raise the threshold for the “two-high” industry loans, incorporate corporate environmental law information into the People's Bank Enterprise Credit Information System and the Banking Regulatory Commission Information Disclosure System, and link with corporate credit rating, loans and securities financing. Establish and implement a green bank rating system, linking the effectiveness of green credits with the performance assessments of bank executives, institutional access, and business development.

Unfinished emission reduction tasks Phased Environmental Impact Assessment (EIA) limit approval Jiangxi Province regards the total amount of pollutants discharged as the pre-condition for the environmental assessment, and places and enterprises that have not achieved the annual emission reduction targets and the key emission reduction projects are not implemented according to the target responsibility. The implementation of phased environmental assessment limit approved. For the investment projects that fail to pass the energy assessment and environmental review review, the relevant departments shall not approve, approve or approve the start of construction, and may not issue production licenses, work safety permits, or sewage discharge permits. Financial institutions may not issue loans, and the relevant units may not provide water or electricity. .

Contaminants exceeded the standards The “black list” was issued in due course to the strict management of Jiangxi's discharge permits. Strengthen the supervision of pollution sources in key river basins, key areas, and key industries, and issue timely lists of enterprises with major pollutants exceeding the standard. The construction of urban sewage treatment facilities is seriously lagging behind, the charging policy is not implemented, the actual treated water volume within 6 months after the completion of the sewage treatment plant is less than 60% of the design capacity, and the sewage treatment facilities have been built but there is no reason not to operate, the approval of the urban project shall be postponed. The EIA has suspended issuing national and provincial construction funds for the relevant projects.

Emission reduction targets shall be integrated into leading cadres' comprehensive evaluation and assessment requirements in Jiangxi Province. Relevant departments of people's governments at all levels must organize special inspections of energy saving and emission reduction, supervise the implementation of various measures, and severely investigate and punish violations of laws and regulations. The implementation of the responsibility system for energy conservation and emission reduction law enforcement, and the acts of administrative inaction, ineffective law enforcement, etc., strictly investigate the responsibility of the person in charge. In addition, the completion of energy saving and emission reduction targets and the implementation of measures are taken as an important part of the comprehensive evaluation and evaluation of leading groups and leading cadres, and they are incorporated into government performance and performance management of state-owned enterprises, implementing the accountability system and the “one-vote veto” system.

Flexible Power Cable

Flexible Power Cable

Chongqing Taishan Cable Co., Ltd. , http://www.cqbareconductor.com

This entry was posted in on